Bungalow extension groundworks and concrete base in Deeside

Full groundworks package for a bungalow extension: strip-out and demolition, muck-away, dig to formation, drainage runs and a power-floated concrete slab ready for the build.

Deeside, Flintshire

Watch the job from start to finish — filmed on site (no sound).
Mini excavator breaking out internal walls during a bungalow extension strip-out
Grab lorry loading broken masonry from the front garden during muck-away
Excavator digging out the driveway and extension footprint at a bungalow
Excavated extension footprint dug down to formation level
Drainage trench dug alongside the extension with boards over the excavation
Damp proof membrane laid over the compacted sub-base before the concrete pour
Freshly poured concrete oversite slab inside the new extension shell
Power-floated concrete slab running through to the garage opening

About this job

  1. 1

    Internal walls broken out and all arisings grab-loaded and taken off site.

  2. 2

    Extension footprint dug to formation and the ground reduced by machine.

  3. 3

    Foul and surface water runs installed and backfilled before the base was built up.

  4. 4

    MOT Type 1 laid and whacked in layers, then blinded and sheeted with damp proof membrane.

  5. 5

    Concrete oversite poured and power-floated level ready for the superstructure.

Products used on this job

Live prices from our shop — order the same materials today.

Other recent projects

Want a drive like this?

Tell us your measurements and we'll work out exactly what you need. Delivery across Chester, Wrexham, the Wirral and North Wales, or collect from Deeside by appointment.

Ask an expert